November 2016 Central London Lettings

Central London office lettings in November 2016 recorded nearly 1,050,000 sq ft of deals from 45 mid-large size transactions (5,000 sq ft+) during the month.

The November figure represents a rise of 17% from the 900,000 sq ft total in October and a rise in the number of office deals over the month.

November was characterised by 10 office deals over 20,000 sq ft, which included Freshfield’s 300,000 sq ft pre-let at 100 Bishopsgate, EC2; Fidelity took 105,000 sq ft at 4 Cannon Street, EC4 and WeWork took 72,000 sq ft at The South Bank Tower, SE1.

Professional services topped the table of lettings by sector, underpinned by the Freshfields deal, along with big lettings to Olswang and Nabarro, followed by the financial sector, boosted by deals to Fidelity and EQT. Business services also performed well helped by more lettings to WeWork. Office deals under offer in central London fell slightlt to 2.5m sq ft after deals in the City and one in Southbank.

By area, the City accounted for only 78pc of the office floorspace let in November – a big increase on the 18pc in October. The West End saw 70,000 sq ft of take-up. Midtown contributed 20,000 sq ft of transactions, but Southbank again performed well with 70,000. Current London office demand is calculated to be around 4m sq ft in the City and 3m sq ft in the West End.

The volume of grade A (newly built or refurbished office space) let during the month reached a remarkable 800,000 sq ft (76% of the total), as transactions for new space kept momentum.

Take-up in central London for January to November 2016 has so far reached 9.4m sq ft with December to come. With two or three large lettings pencilled in the yearly total could touch 11m sq ft.

Cityoffices wishes all its readers a Merry Christmas and prosperous New Year.

Advertisements

Towering Ambitions

London Office Developments – Skyline Survey Winter 2016

Metropolis and Cityoffices has just published a special “Skyline” Survey of the central London office development market for the period April 2016 to October 2016. The survey takes a snapshot of central London office construction in Q4 2016, recent completions, recent pre-let activity and looks ahead to future pipeline projects that will shape the next three years.

Highlights include:

– 109 office schemes currently under construction in central London (14.5m sq ft) compared to 78 a year ago
– 4.2m sq ft at demolition stage
– 37 scheme starts in last six months
– office completions over last six months reached nearly 2m sq ft

If you are considering becoming a Metropolis subscriber and would like a copy of the report please email simon@metroinfo.co.uk.

The Metropolis database system holds all of the above construction data and thousands of other leads on end user office requirements, moves and fit-out projects – for details on accessing the leads and joining Metropolis please email simon@metroinfo.co.uk .

Best quarter for Aberdeen

Recent research from CBRE reveals that in the third quarter of 2016, office lettings in Aberdeen reached 66,174 sq ft. This total made it the best performing quarter in Aberdeen so far this year.

The cumulative Aberdeen take-up volume for the first nine months of 2016 was 152,683 sq ft, below average levels for the end of the third quarter. The low oil price continues to impact on office demand although a recent increase in crude prices to $51, is signalling a possibly better year ahead.

The largest Aberdeen letting to take place in Q3 saw serviced office operator Citibase acquire a 22,000 sq ft west end office building at 9 Queens Road. Within the city centre, another floor of nearly 6,000 sq ft has been let to HM Ministry of Justice at AB1, Orega, the serviced office provider, has signed to take 26,000 sq ft on the 1st and 2nd floors at the under construction, 9-storey ‘Silver Fin’ office scheme in Aberdeen.

Metropolis is tracking around a dozen office searches and potential searches in Aberdeen.

Total office space available at the end of the third quarter reached a new high of 2.45m sq ft, which is a year-on-year increase of 45% from Q3 2015. Muse’s 170,000 sq ft Marischal Square development is also under construction and will complete in Q2 2017.

Prime office headline rents in Aberdeen are unchanged at £32 per sq ft, with an absence of recent prime transactions to challenge the current level.